Description
Finding out the cost of an issue usually requires estimation or guessing, so there are uncertainty and probability involved.
For example, if a server needs to be rebooted once every 24hrs and an operator needs 30 minutes to perform this reboot (and corresponding activities), then you can approximate the cost of this problem for, let’s say, a month:
5 workdays × 4 weeks × 30 min = 10hrs of operator’s effort.
If you multiply with (an approximated or averaged) wage, you get problem cost.
- If possible, try to measure or observe instead of guessing or estimating.
- If you cannot determine real numbers, and you need to guess, estimate or approximate, use Explicit Assumption.